Rudder linkage almost done... Cut in all the control surfaces (ailerons, rudder, elevator, pitch trim tabs), also added cabane struts, and fuel cap... To do: - tailwheel linkage and linkage springs - cables - engine proxy - redo the cowling to more closely match the eagle II